Check. Evaluate. Report.

Site assessment

Numerous factors and individual evaluation criteria influence the choice of location. We take into account the location situation and customer-specific requirements. Based on the company’s objectives, we determine the individual location requirements and compare them with the conditions of alternative locations. We analyze all relevant factors, evaluate the fundamentals, and examine alternatives.

More information?

The Ginger HPC team would be happy to assist you.
Find a location near you.

Services

Environmental Due Diligence

Environmental Due Diligence (EDD) assesses the environmental obligations and potential risks of projects or companies and thus creates the basis for…

Services:

  • Site assessment
  • Risk analysis
  • Documentation review
  • Legal compliance
  • Report and recommendations for action

Site Investigation

Our site investigations provide a comprehensive assessment of the soil, geology and environmental conditions of proposed building sites. We analyze…

Services:

  • Site analysis and evaluation
  • Identification, evaluation, quantification of investment risks
  • Country-specific environmental analyses
  • Solutions
  • Quality assurance

Environmental Audits

Environmental audits provide a structured analysis to review environmental standards and drive sustainable optimization in operations. They are used…

Services:

  • Preparation and planning
  • Document review
  • Plant inspections
  • Data analysis and evaluation
  • Reporting and recommendations for action

Corporate Environmental Protection

Sustainable protection of the atmosphere, water, soil and organisms is our goal. Climate protection and careful use of resources preserve an…

Services:

  • Planning and realization
  • Development
  • Optimization and guarantee
  • Fulfillment of requirements
  • Development

Underground cabling: Ginger HPC as an advocate for soil and construction companies

The urgency of grid expansion to drive the energy transition has become particularly evident due to the Ukraine war. While…
Learn more

DNBA: The most cost-effective way to remediate groundwater and enable land use

Increasing scarcity of available land makes the redevelopment of abandoned sites—so-called brownfields—more important than ever. Industry and the real estate…
Learn more

Building between two water levels

Hamburg’s HafenCity is one of the most impressive urban development projects in the city: since 2001, an entirely new district…
Learn more

Following the water: General drainage plan for Meerbusch

The task was clear: the general drainage plan, now 20 years old, needed to be updated. Not only were there…
Learn more

In-situ: Removed as if by magic

Volatile halogenated hydrocarbons are difficult to remove from soil. Bernadette Bohnert and her team used an innovative method for contaminant…
Learn more

Rockwool Neuburg: Construction in Record Time – Despite the Pandemic

The project began inconspicuously on a gray February day in early 2018. The two of us, Peter Struck and Moritz…
Learn more

Minimizing Remediation Costs, Avoiding Dealbreakers: Working with TERQ-Based Remediation Plans

The number of undeveloped greenfield sites has declined significantly in recent years, bringing the conversion and reuse of decommissioned industrial…
Learn more

Federal Immission Control Act of Germany: Ginger HPC as translator

In the early 1970s, the German Federal Government presented its first environmental programme. The Federal Immission Control Act is intended…
Learn more

The vision for Kesslergrube: Germany’s ambitious remediation of a polluted area

Ambitious remediation of a polluted area instead of “out of sight, out of mind”. Ginger HPC AG is thoroughly remediating…
Learn more

Tracing Elmshorn’s Past – Between Historical Contaminated Sites and Modern Urban Redevelopment

The northern German city of Elmshorn is reinventing its center: a new town hall, new residential and commercial buildings, and…
Learn more

Award-Winning! Contaminated Site Remediation in Ulm

Following extensive investigations for unexploded ordnance, the contaminated soil will be removed using overlapping large-diameter boreholes down to 7 m…
Learn more

Lost rivers and the aftermath of war: Ginger HPC in Kosovo

Ginger HPC GmbH supports the development of knowledge and expertise in Kosovo – with the help of elaborately prepared workshops….
Learn more

Why work with us?

More than 75 years of experience

Since 1948, HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.

Strong international network

With offices across Europe and as a founding member of the INOGEN ALLIANCE, we bring global insights and local expertise to every project.

Award-winning sustainability

From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.

Related Services

Sustainability

At a time when the world is facing challenges such as climate change and the limited availability of natural resources, we take our responsibility…

Cookie Consent with Real Cookie Banner