Remediation at inactive manufacturing plant, Frosinone, Italy
Project description:
After production of mechanical components was discontinued and the site vacated and sold, chlorinated compounds were detected in groundwater by the new owner. Groundwater containment systems were rapidly put in place to avoid diffusion and a remediation design was submitted for regulatory approval. The discovery of contamination generated a litigation over remediation liability between previous and current owners.Services:
- Environmental technical consultancy
- Specialist support to legal litigation
- Environmental monitoring
- Remediation Design
- Management of groundwater containment barrier (wells and treatment systems)
- Interface with Regulators, including Ministry of the Environment
Advantages:
- Interdisciplinary expertise from one consultant only
- Efficient negotiation support with local and national authorities
- Legal framework support for international client needs
At a glance:
Images:

Why work with us?
More than 75 years of experience
Since 1948, Ginger HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.
Strong international network
With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.
Award-winning sustainability
From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.
Our Service Areas
Land Recycling
Experience. Responsibility. Worldwide.
Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…
Environment and Safety
Experience. Responsibility. Worldwide.
The environment and our living conditions determine our quality of life. Development entails changes. Sustainable environmental development is the…
Infrastructure
Experience. Accountability. Valorisation.
Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…
Got a project in mind?
We have the solution.


