Beke, Oil Sand Field, Mangystau Region, Republic of Kazakhstan
Project description:
The oil sand field was known since the ninetieth century and detailed explored in the 1970ies. From this time on oil sand was mined in small scale close to the surface in a small open pit. Until 1991 further exploration was done. The client wants to exploit the oil sand for commercial use. HPC was contracted with several consulting and engineering tasks like mine plan, a Feasibility Study for the oil sand treatment as part of a Bankable Feasibility. Important for the project was also the execution of the Environmental and Social Impact Assessment.Reason:
- development project, mine plan
- planning of an oil sand refinery
- Bankable Feasibility Study
Services:
- Project Management of international companies
- developing of the scoping study for the EIA, both for the mine as for the treatment facility
- public consultation
- interviews
- sampling of water, soil, dust, air
- measuring dust, noise
- developing of the ESIAS
- calculation of mitigation costs
Advantages:
- comprehensive planning services considering all relevant national and international (World Bank) standards from one consulter
Additional project data:
- about 10 million t of bitumen
- licence area 10 km²
- about 300 million m³ material excavated
- bitumen sand treatment
- 500.000 tons bitumen p. a.
At a glance:
Images:


Why work with us?
More than 75 years of experience
Since 1948, Ginger HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.
Strong international network
With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.
Award-winning sustainability
From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.
Our Service Areas
Land Recycling
Experience. Responsibility. Worldwide.
Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…
Environment and Safety
Experience. Responsibility. Worldwide.
The environment and our living conditions determine our quality of life. Development entails changes. Sustainable environmental development is the…
Infrastructure
Experience. Accountability. Valorisation.
Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…
Got a project in mind?
We have the solution.


