Approval planning of Flood protection, Solingen-Unterburg, Germany
Project description:
Solingen Unterburg, flood protection of Eschbach, deepening of the river-bed, new construction of embankments, bridges and underpinnings of retaining walls, bridges and buildings in Solingen Unterburg, Eschbach, Update hydraulic model.Services:
- HOAI Facility Planning of Structures and Structural Design Phases 1-4 (approval planning for a plan approval procedure acc. WHG)
- Surveying, preparation DGM (Digital elevation Model) foreland and river tubing
- Water level calculations
- Site investigations, investigation of existing structures
- Project presentations for public agencies (TÖB), residents, citizens and project participants
Additional project data:
- Bottom width of water from 4.80 m to 6.50 m, depth to 3.0 m
- Full board flood runoff 37.0 m³/s
- Up to 1.6 m lowering of the river bed approx. 500 m
- Partial profile expansion up to 1.0 m
- New construction, underpinning of left and right bank walls over a length of approx. 650 m
- New construction, underpinning of 9 bridge structures
- Fish upstream migration installation by a ‘Raugerinne Basin pass’
At a glance:
Images:


Why work with us?
More than 75 years of experience
Since 1948, Ginger HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.
Strong international network
With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.
Award-winning sustainability
From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.
Our Service Areas
Land Recycling
Experience. Responsibility. Worldwide.
Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…
Environment and Safety
Experience. Responsibility. Worldwide.
The environment and our living conditions determine our quality of life. Development entails changes. Sustainable environmental development is the…
Infrastructure
Experience. Accountability. Valorisation.
Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…
Got a project in mind?
We have the solution.


