EHS Audit, Milan, Italy
Project description:
Soil borings, analysis of soil samplings, groundwater sampling and monitoring activities. Removal of USTs by means of a back hoe and preliminary verification of soil quality. Safety management during the execution of decommissioning activities. Preliminary cost estimate for the goal of residential use of the site.Reason:
- Investigate potential environmental liabilities
- Identify the best cost/benefit design approach for soil remediation and conversion of the area to residential use
Services:
- Preliminary EHS investigation and audit
- UST removal
- Asbestos survey
- Environmental characterization and EHS risk assessment
- Cost estimate of the potential environmental liabilities
Advantages:
- Reliable cost evaluation to overcome environmental liabilities
- Compliance with national environmental regulations
- Decommissioning project performed on-time and within budget
Additional project data:
- Preliminary estimate performed for two different design assumptions
At a glance:
Images:


Why work with us?
More than 75 years of experience
Since 1948, Ginger HPC has combined expertise and precision in environmental and engineering projects – ensuring reliable solutions that stand the test of time.
Strong international network
With offices across Europe, as part of the Ginger Group and as a founding member of the Inogen Alliance, we bring global insights and local expertise to every project.
Award-winning sustainability
From international certifications to industry awards, our achievements reflect engineering precision, high standards, and a continuous drive for innovation.
Our Service Areas
Land Recycling
Experience. Responsibility. Worldwide.
Life is constantly evolving. New buildings and installations are emerging on freely available land. Elsewhere occupied land is being redeveloped and…
Environment and Safety
Experience. Responsibility. Worldwide.
The environment and our living conditions determine our quality of life. Development entails changes. Sustainable environmental development is the…
Infrastructure
Experience. Accountability. Valorisation.
Regional economic objectives of investment-related infrastructure policies can only be achieved by thorough infrastructure planning. Infrastructure…
Got a project in mind?
We have the solution.


